Alternative 3: Rehabilitate the existing bridge to handle traffic in one direction, and build a new two-lane bridge to handle traffic in the opposite direction.
home   next
The new bridge would be designed so as not to detract from the visual effect of the existing bridge. Traffic would be maintained during the project. The cost of rehabilitating the existing bridge and building a second bridge would be about $45 million.
side view of current Liberty Memorial Bridge
side view of concrete or steele girder bridge design
Maintenance costs for the new and existing bridge would be about $9 million over the next 50 years. Right of way and roadway construction costs would be about $3 million, bringing the total cost to about $57 million.

North Dakota Dept of Transportation logo

This website is maintained by the Multi-Media section of the NDDOT
Copyright © 2003 North Dakota Department of Transportation. All rights reserved.
If you have questions or comments, please direct them to: dot@state.nd.us

Memorial Bridge home page   Selected alternative   Public involvement  
Design alternatives   Bridge conditions requiring action  
Alternatives and costs   Final Environmental Documents   Comments?   Privacy Policy  

Bobby Approved

Valid CSS!

 
Level Double-A conformance icon, 
          W3C-WAI Web Content Accessibility Guidelines 1.0