Liberty Memorial Bridge

1/05/2007

dot@nd.gov

page 1 of 2 Next

Pier 12 as seen through twin pier column forms of pier 7 The twin pier column forms for pier 7 as seen from east approach Two men on top of transition pier 12
Pier 12 as seen through twin pier column forms of pier 7.jpg         The twin pier column forms for pier 7 as seen from east approach.jpg         Two men on top of transition pier 12.jpg        
east side tent inside which the MSE or retaining wall is being built east wall of transition pier 12 transition pier 12 formed up and being covered ahead of next week's pour
east side tent inside which the MSE or retaining wall is being built.jpg         east wall of transition pier 12.jpg         transition pier 12 formed up and being covered ahead of next week's pour.jpg        
twin pier column forms for pier 7, pier stems of pier 8 and existing bridge as seen from east two men on top of transition pier 12 laying blankets across the top ahead of next week's pour two men working on top of transition pier 12 covering it ahead of next week's pour
twin pier column forms for pier 7, pier stems of pier 8 and existing bridge as seen from east.jpg         two men on top of transition pier 12 laying blankets across the top ahead of next week's pour.jpg         two men working on top of transition pier 12 covering it ahead of next week's pour.jpg