Memorial Home
Liberty Memorial Bridge
1/05/2007
dot@nd.gov
page 1 of 2
Pier 12 as seen through twin pier column forms of pier 7.jpg
The twin pier column forms for pier 7 as seen from east approach.jpg
Two men on top of transition pier 12.jpg
east side tent inside which the MSE or retaining wall is being built.jpg
east wall of transition pier 12.jpg
transition pier 12 formed up and being covered ahead of next week's pour.jpg
twin pier column forms for pier 7, pier stems of pier 8 and existing bridge as seen from east.jpg
two men on top of transition pier 12 laying blankets across the top ahead of next week's pour.jpg
two men working on top of transition pier 12 covering it ahead of next week's pour.jpg