Liberty Memorial Bridge

1/26/2007

dot@nd.gov
Memorial Home

Backhoe on east approach, crane on barge, pier 7 forms and thru trusses Backhoe scooping dirt from pier 6 footing dumps bucketful of dirt Mudbucket lowered to pier column at pier 7, as seen through the archway pier of the existing bridge
Backhoe on east approach, crane on barge, pier 7 forms and thru trusses.jpg         Backhoe scooping dirt from pier 6 footing dumps bucketful of dirt.jpg         Mudbucket lowered to pier column at pier 7, as seen through the archway pier of the existing bridge.jpg        
Mudbucket swung to two pier column forms at pier 7 Three workers empty mud bucket into pier column form at pier 7 Two workers dump mudbucket into pier form at pier 7
Mudbucket swung to two pier column forms at pier 7.jpg         Three workers empty mud bucket into pier column form at pier 7.jpg         Two workers dump mudbucket into pier form at pier 7.jpg