Liberty Memorial Bridge

2/02/2007

dot@nd.gov

MSE retaining wall and worker below Weisa and sons worker cuts 2x6 Weisz and sons worker levels sand behind MSE wall on east approach
MSE retaining wall and worker below.jpg         Weisz and sons worker cuts 2x6.jpg         Weisz and sons worker levels and behind MSE wall on east approach.jpg        
driving sheet pile at pier 10 entrance to MSE wall tent iron being lifted to be placed into pile driver at transition pier 6
driving sheet pile at pier 10.jpg         entrance to MSE wall tent.jpg         iron being lifted to be placed into pile driver at transition pier 6.jpg        
two cranes, two pile drivers at pier 10 worker pushes iron to be lifted into pile driver for transition pier 6 workers level sand inside MSE wall tent between pile casings
two cranes, two pile drivers at pier 10.jpg         worker pushes iron to be lifted into pile driver for transition pier 6.jpg         workers level sand inside MSE wall tent between pile casings.jpg