MSE retaining wall and worker below.jpg
Weisz and sons worker cuts 2x6.jpg
Weisz and sons worker levels and behind MSE wall on east approach.jpg
driving sheet pile at pier 10.jpg
entrance to MSE wall tent.jpg
iron being lifted to be placed into pile driver at transition pier 6.jpg
two cranes, two pile drivers at pier 10.jpg
worker pushes iron to be lifted into pile driver for transition pier 6.jpg
workers level sand inside MSE wall tent between pile casings.jpg