six rodbusters tie steel for rebar cage three workers place concrete from pumper truck in to footings at pier 6 vert top of transition pier 6 with back hoe and loader working near the base
six rodbusters tie steel for rebar cage.jpg         three workers place concrete from pumper truck in to footings at pier 6 vert.jpg         top of transition pier 6 with back hoe and loader working near the base.jpg        
two carpenters look over drawings while leaning on form for transition pier 6 footings two newly stripped pier columns at pier 3 two rodbusters tie steel on rebar cage (side shot)
two carpenters look over drawings while leaning on form for transition pier 6 footings.jpg         two newly stripped pier columns at pier 3.jpg         two rodbusters tie steel on rebar cage (side shot).jpg        
work site with transitionpier 12 in foreground. Pier 10 coffer dam and twin forms for pier 7 in bkgd worker at base of existing pier next to newly stripped pier column at pier 3 workers directs concrete outta tube for transition pier 6 footing concrete placement
work site with transitionpier 12 in foreground. Pier 10 coffer dam and twin forms for pier 7 in bkgd.jpg         worker at base of existing pier next to newly stripped pier column at pier 3.jpg         workers directs concrete outta tube for transition pier 6 footing concrete placement.jpg