six rodbusters tie steel for rebar cage.jpg
three workers place concrete from pumper truck in to footings at pier 6 vert.jpg
top of transition pier 6 with back hoe and loader working near the base.jpg
two carpenters look over drawings while leaning on form for transition pier 6 footings.jpg
two newly stripped pier columns at pier 3.jpg
two rodbusters tie steel on rebar cage (side shot).jpg
work site with transitionpier 12 in foreground. Pier 10 coffer dam and twin forms for pier 7 in bkgd.jpg
worker at base of existing pier next to newly stripped pier column at pier 3.jpg