Memorial Home
Liberty Memorial Bridge

3/23/2007

dot@nd.gov

Am flag on tug in front of pier 6 Pier 6 wrapped for concrete placement as seen through existing bridge Three workers, two down, one up, strip forms from east abutment
Am flag on tug in front of pier 6.jpg Pier 6 wrapped for concrete placement as seen through existing bridge.jpg Three workers, two down, one up, strip forms from east abutment.jpg
crane at pier 11, transition pier 12, piers 13 and 14 east side work at pier 10 as seen from west shore pier 6 wrapped waiting for concrete placement
crane at pier 11, transition pier 12, piers 13 and 14.jpg east side work at pier 10 as seen from west shore.jpg pier 6 wrapped waiting for concrete placement.jpg
setting sheet steel with vibe hamme over head to build cofferdam at pier 11 worker on top of MSE retaining wall strips forms and blankets  
setting sheet steel with vibe hamme over head to build cofferdam at pier 11.jpg worker on top of MSE retaining wall strips forms and blankets.jpg