Liberty Memorial Bridge

3/29 dot@nd.gov

page 1 of 2 Next

Three workers give thumbs up while on top of pier 6 during concrete placement concrete placement at transition pier 6 as seen from existing bridge walkway looking up at two concrete pumpers and concrete truck at transition pier 6
Three workers give thumbs up while on top of pier 6 during concrete placement.jpg         concrete placement at transition pier 6 as seen from existing bridge walkway.jpg         looking up at two concrete pumpers and concrete truck at transition pier 6.jpg        
pier 2 as seen from above pile driving at pier 10 as seen from existing bridge placing concrete in transition pier 6
pier 2 as seen from above.jpg         pile driving at pier 10 as seen from existing bridge.jpg         placing concrete in transition pier 6.jpg        
pumping concrete from two pumpers in to transition pier 6 vertical shot side by side bridges with piers 3-6 while concrete is placed in transition pier 6 strata truck rolls past site under Expwy signs
pumping concrete from two pumpers in to transition pier 6 vertical shot.jpg         side by side bridges with piers 3-6 while concrete is placed in transition pier 6.jpg         strata truck rolls past site under Expwy signs.jpg