6-06-08

dot@nd.gov

Men working on the end of the rolling scaffold platform Overlooks formed at first three west piers Pier 7 and overlook forms above
Men working on the end of the rolling scaffold platform.jpg Overlooks formed at first three west piers.jpg Pier 7 and overlook forms above.jpg
Plywood remaining under the bridge deck with the scaffold from the rolling scaffold platform. The operator on the rolliing scaffold platform that is used to susped scaffold below the bridge to remove the deck forms. Two utility towers with men working off of lift at top of tower
Plywood remaining under the bridge deck with the scaffold from the rolling scaffold platform..jpg The operator on the rolliing scaffold platform that is used to susped scaffold below the bridge to remove the deck forms..jpg Two utility towers with men working off of lift at top of tower.jpg
Workers check the wheels on the rolling platform used to suspend a lower platform under the bridge deck to remove deck forms. workers work on wheels on the rolling under-scaffold platform used to remove bridge deck forms.  
Workers check the wheels on the rolling platform used to suspend a lower platform under the bridge deck to remove deck forms..jpg workers work on wheels on the rolling under-scaffold platform used to remove bridge deck forms..jpg