Memorial Home
Liberty Memorial Bridge
6-08-07

dot@nd.gov

Goose family at Mem Bridge site pier 11 piling sticking up, ready to be cut off river channel through east side sandbar at the job site, the culvert under the causeway and the exit back into the main stream channel Vert LS
Goose family at Mem Bridge site.jpg         pier 11 piling sticking up, ready to be cut off.jpg         river channel through east side sandbar at the job site, the culvert under the causeway and the exit back into the main stream channel Vert LS.jpg        
river channel through the sandbar and the jobsite on the east sandbar sandbar channel exits into main channel, boat and people at exit, shot from across the river two workers at base of vibratory hammer at pier 10 cofferdam
river channel through the sandbar and the jobsite on the east sandbar.jpg         sandbar channel exits into main channel, boat and people at exit, shot from across the river.jpg         two workers at base of vibratory hammer at pier 10 cofferdam.jpg        
worker walks across bridge decking on east approach bridge workers deck east approach ii workers on east approach bridge walk across bridge decking forms
worker walks across bridge decking on east approach bridge.jpg         workers deck east approach ii.jpg         workers on east approach bridge walk across bridge decking forms.jpg