Memorial Home
Liberty Memorial Bridge
7-27-07
dot@nd.gov
page 1 of 3
Gabe Construction crew works on utility line on north side of east end of bridge for MDU.jpg
POW flag on top of American Crane.jpg
Pontoon ignores no-wake zone.jpg
Weisz loader moves in to dump dirt for base of west abutment wall.jpg
boat through work site.jpg
boat through work site obeys no-wake zone.jpg
clam buckeet drumps mud in to side dump taken from river bed and track hoe in bkgd dredging river beween piers 8 and 9.jpg
crane swings clam bucket of mud out from pier 10 to side dump truck.jpg
finishers work from man lilft to finish the surface of pier 5.jpg