Home
Liberty Memorial Bridge

8/18/2006

dot@nd.gov

Previous page 2 of 2

jet ski ignores no wake zone at pier 7 jet ski races through construction site pontoon ignores no wake region past pier 7 close up
jet ski ignores no wake zone at pier 7.jpg         jet ski races through construction site.jpg         pontoon ignores no wake region past pier 7 close up.jpg        
tug maneuvers between crane barge and shore tug pushes barge at pier 8, piles waiting at pier 7 tug under the bridge
tug maneuvers between crane barge and shore.jpg         tug pushes barge at pier 8, piles waiting at pier 7.jpg         tug under the bridge.jpg        
worker at base of piles at pier 7 worker measures pile driving movement at pier 8 workers prepare to hoist sheet pile off truck
worker at base of piles at pier 7.jpg         worker measures pile driving movement at pier 8.jpg         workers prepare to hoist sheet pile off truck.jpg