Home
Liberty Memorial Bridge
8/25/2006
dot@nd.gov
page 1 of 4
DOT inspector records data from pile driving while Lunda worker measures movement from each blow.jpg
DOT inspector Emily and workers at concrete pumper.jpg
East side of project site shows protective canopy for bike trail users next to pile driver.jpg
Lunda worker measures movement of pile being driven as DOT inpsector watches work.jpg
bicyclist exits protective canopy next to pile driving on east end.jpg
bicyclists enter protective canopy next to east end of bridge site.jpg
bicyclists exit protective canopy on east end.jpg
concrete pumped into pier 7 for seal.jpg
concrete trucks empty into concrete pumper.jpg