tug goes behind barge at pier 7 on way to pier 8 tug pushes barge at pier 8, piles waiting at pier 7 two concrete pumper booms used to move concrete from shore to pier 7
tug goes behind barge at pier 7 on way to pier 8.jpg tug pushes barge at pier 8, piles waiting at pier 7.jpg two concrete pumper booms used to move concrete from shore to pier 7.jpg
two workers place concrete in pier 7 for seal white concrete pumper on barge places concrete in pier 7 for seal worker at base of piles at pier 7
two workers place concrete in pier 7 for seal.jpg white concrete pumper on barge places concrete in pier 7 for seal.jpg worker at base of piles at pier 7.jpg
worker dumps concrete into pumper to move to pier 7. DOT inspector Emily in corner worker guides pile driver on to pile at pier 7 worker measures pile driving movement at pier 8
worker dumps concrete into pumper to move to pier 7. DOT inspector Emily in corner.jpg worker guides pile driver on to pile at pier 7.jpg worker measures pile driving movement at pier 8.jpg