Memorial Home
Liberty Memorial Bridge

9/08/2006

dot@nd.gov

page 1 of 4 Next

Pier 7 piling extends from dewatered coffer dam Water near top of coffer dam 7 boat ignores no wake zone
Pier 7 piling extends from dewatered coffer dam.jpg         Water near top of coffer dam 7.jpg         boat ignores no wake zone.jpg        
clam bucket dumps mud on barge from pier 8 clam bucket raised up out of pier 8 cofferdam 7 in the water
clam bucket dumps mud on barge from pier 8.jpg         clam bucket raised up out of pier 8.jpg         cofferdam 7 in the water.jpg        
crane lifts clam bucket from pier 8 from overhead, two pipes empty water from Pier 7 while two men connect eletrical box on the barge log floats to cofferedam 7
crane lifts clam bucket from pier 8.jpg         from overhead, two pipes empty water from Pier 7 while two men connect eletrical box on the barge.jpg         log floats to cofferedam 7.jpg