Memorial Home
Liberty Memorial Bridge

9/08/2006

dot@nd.gov

Previous page 3 of 4 Next

truck stockpiles river sand from pier excavation tug moves empty barge to pier 7 where full barge is waiting two pipe dump water from pier 7
truck stockpiles river sand from pier excavation.jpg         tug moves empty barge to pier 7 where full barge is waiting.jpg         two pipe dump water from pier 7.jpg        
water flows from two pumps dewatering pier 7, leaving piling standing inside cofferdam water over the dam -- almost worker directs crane to lower steel into pier 7 cofferdam
water flows from two pumps dewatering pier 7, leaving piling standing inside cofferdam.jpg         water over the dam -- almost.jpg         worker directs crane to lower steel into pier 7 cofferdam.jpg        
worker looks into base of pier 7 as it is dewatered worker signals crane lifting load up out of cofferdam 7 workers covers exit sign
worker looks into base of pier 7 as it is dewatered.jpg         worker signals crane lifting load up out of cofferdam 7.jpg         workers covers exit sign.jpg