Memorial Home
Liberty Memorial Bridge
11-02-07
dot@nd.gov
page 2 of 3
Tub girders curve next to old bridge.jpg
early morning light glows around worksite as crews get set to lift next beam over water.jpg
first beam to reach pier 8 is held above the bearings waiting to be set.jpg
four girders curve from piers 6, across 7 to pier 8.jpg
girder suspended over pier 9.jpg
ironworker between to girders to be connected talks to operator via handheld mic.jpg
ironworker waits for girder to be moved in to place over pier 9.jpg
long girder pulled up along side existing bridge waiting to be unloaded.jpg
one crane holds last girder in place while two others prepare to lift next girder.jpg