Memorial Home
Liberty Memorial Bridge
11-02-07

dot@nd.gov

Previous page 2 of 3 Next

Tub girders curve next to old bridge early morning light glows around worksite as crews get set to lift next beam over water first beam to reach pier 8 is held above the bearings waiting to be set
Tub girders curve next to old bridge.jpg early morning light glows around worksite as crews get set to lift next beam over water.jpg first beam to reach pier 8 is held above the bearings waiting to be set.jpg
four girders curve from piers 6, across 7 to pier 8 girder suspended over pier 9 ironworker between to girders to be connected talks to operator via handheld mic
four girders curve from piers 6, across 7 to pier 8.jpg girder suspended over pier 9.jpg ironworker between to girders to be connected talks to operator via handheld mic.jpg
ironworker waits for girder to be moved in to place over pier 9 long girder pulled up along side existing bridge waiting to be unloaded one crane holds last girder in place while two others prepare to lift next girder
ironworker waits for girder to be moved in to place over pier 9.jpg long girder pulled up along side existing bridge waiting to be unloaded.jpg one crane holds last girder in place while two others prepare to lift next girder.jpg