Liberty Memorial Bridge
4-26-07

dot@nd.gov

beams on two spans of east side, choker ready to lift beam into third span concrete box girder lifted from truck under third span on east side ironworker holds guy rope on end of concrete box girder to be lifted truck with beam under last span on east side two beams across entire 3 spans
beams on two spans of east side, choker ready to lift beam into third span.jpg         concrete box girder lifted from truck under third span on east side.jpg         ironworker holds guy rope on end of concrete box girder to be lifted.jpg         truck with beam under last span on east side.jpg         two beams across entire 3 spans.jpg