DOT inspectors check first box girder before it is hoisted in to place between piers 5 and 6 on west side Two iron workers in man basket at top of pier 5 causeway in early morning, with pier 8 wrapped up in foreground
DOT inspectors check first box girder before it is hoisted in to place between piers 5 and 6 on west side.jpg         Two iron workers in man basket at top of pier 5.jpg         causeway in early morning, with pier 8 wrapped up in foreground.jpg        
iron worker on pier 5 eases end of box girder in to place iron worker signals crane to lower boom while setting box girder on pier 6 iron worker walks on pier 6 while box girder swings in to place
iron worker on pier 5 eases end of box girder in to place.jpg         iron worker signals crane to lower boom while setting box girder on pier 6.jpg         iron worker walks on pier 6 while box girder swings in to place.jpg        
ironworker on pier 5 signals crane to lower first box girder on west approach piers 7 and 8 with barge in bkgd tug pushes barge past pier 8 ii
ironworker on pier 5 signals crane to lower first box girder on west approach.jpg         piers 7 and 8 with barge in bkgd.jpg         tug pushes barge past pier 8 ii.jpg