Liberty Memorial Bridge

9/08/2006

dot@nd.gov

Previous page 2 of 3 Next

first bridge section down, from under the bridge first section down of west end of bridge lifting rebar cage for pier 7
first bridge section down, from under the bridge.jpg         first section down of west end of bridge.jpg         lifting rebar cage for pier 7.jpg        
pontoon ignores no wake zone setting steel in pier 7 with shoreline in background and pumper truck side of pier form lowered in to place
pontoon ignores no wake zone.jpg         setting steel in pier 7 with shoreline in background and pumper truck.jpg         side of pier form lowered in to place.jpg        
three workers in the piling at pier 8 track hoe breaks up concrete under bridge arch two workers check depth when placing concrete for seal at pier 8
three workers in the piling at pier 8.jpg         track hoe breaks up concrete under bridge arch.jpg         two workers check depth when placing concrete for seal at pier 8.jpg